Advertisement

Starter Course Shingles Upside Down

Starter Course Shingles Upside Down - Seal line is on the drip edge. Every great roof starts with the right foundation—meet the starter shinglein this step of your roof replacement, slopepro installs the starter shingle—the fi. Later, we’ll need to lift the shingles in this course to slip shingles in from below, so nailing high is a necessity. The tar strip on the starter should line up with the tar strip on the shingle. If these first shingles are not installed correctly, there will be problems with the entire set of shingles. So, you nail your starter just behind the drip edge; Some starter strip rolls from the big box rip off stores have a peal off adhesive side that is supposed to stick to the roof, so it does go down. Reestablishing the starter course when shingling around a dormer or other obstruction on the roof deck that interrupts the starter course, run shingles to a point past the obstruction, then strike a new set of bond lines using the end of a shingle as a reference point. If it's a laminate the two pieces are actually equal. So i ran into a guy saying the starter strips are supposed to be tar down.

Some starter strip rolls from the big box rip off stores have a peal off adhesive side that is supposed to stick to the roof, so it does go down. Place the shingle upside down on a sheet of plywood and use a straightedge to. You shouldn't tar your drip edge as your shingles are not waterproof but rather water shedding. So, you nail your starter just behind the drip edge; I don't think the wrapper says to let the starter course hang 3 over the gutter! Put starter upside down (top and bottom, not front and back) hang over 3 inches for gutter and put your first course at least 6 inches from seam of starter. In addition, this starter course protects the roof by filling in any gaps. If these first shingles are not installed correctly, there will be problems with the entire set of shingles. The first shingle is then lapped over the edge by 1/2 to 3/4 to provide a drip edge off the roof or into the gutter. That would have come with instructions though.

roofing starter strip application Torri Nunn
Replacing Roof Shingles IBUILDIT.CA
Asphalt Roof Shingling Basics JLC Online Roofing
10 Roof Goofs and How to Fix Them Fine Homebuilding
How To Install Starter Strip Roof Shingles Roof Shingles For
How To Shingle A Roof Valley Roof Shingles For Australian Homes
Roofing Sales Cheat Sheet BidList
Your StepbyStep Guide to Installing Cedar Shake Siding
How to Install 3Tab Roof Shingles
How to Install Starter Strip on a Shingle Roof Roof Repair Specialist

If The Starter Shingles Are Not Secured Correctly At The Eave Or Rake, And The First Course Of Shingles Is Not Nailed Down Evenly Across The Top Of The Starter Shingles, The Roof May Be At Risk For Wind And/Or Water Damage.

Or use both top and bottom as starters. So, you nail your starter just behind the drip edge; Seal line is on the drip edge. Working from left to right, they continue with the starter course and full shingles until they have enough coverage to continue up the roof with full shingles.

This Way, Your First Run Of Shingle Is More Wind Resistant.

So i ran into a guy saying the starter strips are supposed to be tar down. You shouldn't tar your drip edge as your shingles are not waterproof but rather water shedding. Put starter upside down (top and bottom, not front and back) hang over 3 inches for gutter and put your first course at least 6 inches from seam of starter. The installer wants to come back and install them correctly by removing the first 6 ft of shingles and installing new ice and water shield.

Place The Shingle Upside Down On A Sheet Of Plywood And Use A Straightedge To.

If these first shingles are not installed correctly, there will be problems with the entire set of shingles. (upside down) same guy who puts drip edge lip over ice shield. The proper way to adapt three tabs as starters is to trim the tabs off the shingle along a line across the tops of the cutouts. To maintain the proper offset, they lay the next shingle upside down and use the notch on the previous shingle to locate the cut.

Reestablishing The Starter Course When Shingling Around A Dormer Or Other Obstruction On The Roof Deck That Interrupts The Starter Course, Run Shingles To A Point Past The Obstruction, Then Strike A New Set Of Bond Lines Using The End Of A Shingle As A Reference Point.

That would have come with instructions though. Personally i like to use a 3 tab shingle with the tabs cut off. Best thing is to look at the directions and pictures on wraper. When i got down to the edge i was surprised how easily the last row popped off.

Related Post: